PRIME DISTILLERY

IMG_8914.jpg
  1. It was built in October 2006;

  2. The area is 13 hectares;

  3. 7 lines with a capacity of 71 thousand bottles per hour;

  4. The main workshops are: the administrative building, the water treatment plant, alcohol storage, the blending shop, the bottling shop, the container workshop, the material warehouse, two laboratories, storage facilities, the energy-mechanical shop, the distribution warehouse of the finished product;

  5. The capacity of the alcohol store is 2,000,000 liters of alcohol;

  6. The volume of treatment facilities - 5 000 m3, capacity - 400 m3 per day.

  7. Site : www.olymp.ua